Multiple High-Pressure High Flow Fire Pump Delivery System.Multiple Low-Pressure Potable Water Pump Delivery System.Backwash Storage Tanks with water recovery system.Multimedia Filtration System with chemical addition.The water treatment system consists of the following components: Water Treatment System and finished potable water storage.Three Raw Water Wells for potable water supply.This project incorporates the following components: The contract has now transitioned into a long-term operations contract. The casino is operated by Caesars Entertainment on behalf of the Buena Vista Me-Wuk Indians.Īt the time of commissioning this project in April/May 2019, AWM first began with a startup and commissioning contract where we assisted the contractor and the engineers to get the systems all tested and online. Aquality Water Management (AWM) have been associated with this project since its inception. Harrah’s Northern California Casino project was originally conceived in the early 2000’s.